Custom Fluid Testing

Fouling, gelling, pieces and extremes - tested before sizing

Contact us

When the standard tests do not answer the question

A test plan agreed around your product and your duty

Viscosity, rheology and reverse sweep tests describe how a product flows. Some products raise questions those tests cannot answer: will it bake onto a hot wall, will it set solid if it cools past a certain point, will the pieces survive the pump and the U-bends, what does it do at the very top of its process range? For those, we agree a custom test with you before sizing, built around the one behavior that decides the design.

Custom testing is common for new formulations, for products moving from a pilot plant to full production, and for duties where an earlier exchanger failed. A product that fouled a plate pack in hours, a filling that gelled in a cooler, a slurry that wore through a bend - each has a specific failure to examine, and the test is designed to reproduce it under controlled conditions.

The plan states what is measured, under which conditions, and how each result feeds the design. Agreeing that first keeps the work focused and spends the sample on questions that change the exchanger.

Request a Quote
Multi-tube heat exchanger section showing the bundle of product tubes at the open end
Test plannoun

A short written agreement, made before any sample ships, naming each measurement, its temperatures and shear conditions, the sample needed and the design decision each result will settle.

Custom tests and what they settle

Typical custom tests for tube-in-tube duties. Each one is scoped to the product and to the decision it has to support.

Test Detail
Fouling tendency Deposit build-up on a heated surface at the planned wall temperature
Gel or set point Temperature and time at which the product stops flowing
Thermal stability Change in viscosity, color or separation at the top of the range
Particle survival Piece damage after pumping and repeated bends at design velocity
Settling How fast pieces drop out of the carrier at low velocity
Cooling behavior Crystallization or thickening as the product cools toward fill
Cleanability How readily deposits release under the planned CIP chemistry

Fouling tendency

Protein, starch and sugar products foul when the wall runs hotter than they tolerate; mineral-laden streams scale once heated past a solubility limit. A fouling test holds the product against a heated surface at the planned wall temperature and records how quickly a deposit forms. The result sets the margin between wall and product temperature, the choice of heating medium, and the run length between cleanings the design can realistically plan for.

Products that set or gel

Gelatin desserts, starch puddings, some fillings and many waxes and resins flow when hot and set as they cool. In a cooler, the danger is a layer setting on the cold wall and growing inward until the tube plugs. A test finds the temperature and time at which the product stops flowing, so the cooling medium can be held above it at the wall, or the cooler staged so the product leaves while still pumpable.

Particulate products

Standard viscometers measure the carrier, not the pieces. A custom test can recirculate the product through pump and bend geometry at the design velocity and count the pieces broken, measure how fast pieces settle in the carrier, and check heat penetration into a piece. Those results set the bore, the velocity window and the U-bend radius - choices that carrier viscosity alone cannot make.

Extremes of temperature

Products processed far hotter or colder than usual can behave in ways no table records: separation, darkening, outgassing, or a sharp rise in viscosity near freezing. Testing at the actual extremes of the duty, including the wall temperature, shows what the exchanger surface will meet. It is particularly worth doing when the service side is thermal oil or glycol running well outside the product's normal range.

Agreeing the plan before the sample ships

Start with the decision, not the test

Every measurement should be able to change something. The plan begins with the design choices still open - bore, length, corrugated or smooth tube, heating medium, cleaning interval - and works back to the measurements that settle them. A test that cannot alter the design is dropped. That keeps the sample requirement small and makes the results directly usable once sizing starts.

What goes into the plan

The plan is a short written document that both sides agree before the sample ships, and results are reported against it, so the link from data to design is easy to follow.

  • Product description, expected variants and safe-handling notes
  • Each measurement with its temperatures, shear or velocity, and duration
  • Sample quantity, containers and storage conditions for shipping
  • The design question each result answers

Using what the test finds

Results sometimes confirm the original design and sometimes change it outright - a cooler that becomes two stages, a bore that grows to protect pieces, a heating medium switched from steam to hot water to stop burn-on. Either way, the decision is made on data from your product before the order, which is where changes cost least.
Call and talk it through with an engineer: 1-805-484-2992

Planning a custom test

Often, yes, if we know the wall temperature, velocity and run length at which it fouls today. Matching those conditions on a heated test surface shows whether the deposit is driven by wall temperature, by low velocity or by the product itself. That tells us whether a tube-in-tube with a wider path and a gentler heating medium will cure it or only delay it.

Send the product with its pieces, in the sizes and proportions production uses. Breakage, settling and heat penetration depend on the real pieces, their firmness and their shape, and a carrier-only sample hides all of it. If the pieces are added separately on your line, send them packed the same way, with the ratio at which they are blended.

It depends on the plan. A gel-point check is quick; a fouling test that has to run long enough to show a deposit trend takes longer. We give a timetable with the test plan, before anything ships, so it can be fitted into the project schedule. Running tests in parallel with a budget quote keeps the project moving.

Tell us at the start. The plan records the safety data sheet, handling precautions and any limits on heating, shipping or disposal, and the tests are arranged around them. Some measurements may be made on a safer model fluid that matches the flow behavior, with only the essential checks run on the real product. Never ship a hazardous sample before the plan is agreed.

Usually not, if the duty is unchanged and the current exchanger's performance is known. Operating data - temperatures, pressures, flow and cleaning interval - can be a better guide than a bench test. A custom test earns its place when the duty changes: a higher rate, a new temperature, a reformulation, or a move to tube-in-tube to cure a problem.

Related

Thick creamy product being poured into a bowl

Sizing & Selection

Viscosity

Viscosity testing across the heating or cooling range, so a tube-in-tube heat exchanger is sized on measured data instead of one room-temperature figure.

+ Learn More
Close view of stiff whipped cream texture

Sizing & Selection

Rheology

Rheology testing for tube-in-tube sizing: shear-thinning flow behavior, power-law constants, yield stress and the apparent viscosity at the tube wall.

+ Learn More
Thick tomato sauce lifted on a spoon

Sizing & Selection

Reverse Sweep

Reverse sweep testing ramps shear up and back down to measure thixotropy and recovery, so start-up pressure and pump sizing reflect a product at rest.

+ Learn More

Quote Request Form:

Questions?

1-805-484-2992