Request a Quote

A tube-in-tube quote is only as firm as the duty behind it. Fill in what you know below; blank fields are fine, but every value we have to guess adds margin, and margin on a tube-in-tube exchanger means extra sections you pay for.

Our reply names a proposed design, materials, connections and the questions that still matter. Where the viscosity is uncertain, we will suggest testing a sample before the size is fixed.

Quote Request Form

Start with the product and the duty below; every extra detail you add takes a question out of our reply.

Rather talk it through?

Call us 1-805-484-2992
Email us Sales@HeatX.com
Viscosity Viscosity
Temperatures Temperatures
Flow Rate Flow Rate
Particle Size Particle Size

The Duty We Need

These values set the length of the exchanger. Without them a quote is an estimate wearing a price tag, and a viscosity guessed at room temperature can be badly wrong at the cold end of a cooler.

  • Product name and what is in it
  • Flow rate in gpm or lb/hr
  • Inlet and outlet temperatures
  • Viscosity at temperature, if known
  • Largest particle size and its type

The Build We Need

These set the construction: which family, which alloy, which ends and which paperwork ships with the unit.

  • Utility: steam, hot water, cooling water, glycol or thermal oil
  • Design pressures on the product and service sides
  • Material or alloy requirements
  • Code needs: ASME, National Board or 3-A
  • Connections: tri-clamp, flanged or threaded

What Happens After You Send It

1.

We Read the Duty


An engineer reviews the product, temperatures and flow, checks them against each other and flags anything inconsistent, such as a product outlet temperature set beyond the supply temperature of the utility.

2.

We Ask What Is Missing


Gaps come back as short, specific questions rather than a form to refill. Viscosity at the cold end, particle size and allowable pressure drop are the three we ask about most, because each one moves the length.

3.

We Test If It Matters


When the flow behavior of the product is uncertain, we arrange viscosity, rheology or reverse-sweep testing on a sample so the design rests on measured data. For a water-like fluid that step is skipped.

4.

You Get a Proposal


The proposal states the design, materials, connections, codes and the exact duty it was sized for, so you can check it line by line against your specification and any plate or shell-and-tube offer on your desk.

Quote Request Form:

Questions?

1-805-484-2992

Quotes - Engineering - Sales